CPD: Steel and offsite construction
Time limit: 0
Quiz Summary
0 of 5 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Quiz complete. Results are being recorded.
Results
0 of 5 Questions answered correctly
Time has elapsed
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 5
1. Question
On average, how long is the lead time before structural steel is required on site?
CorrectIncorrect -
Question 2 of 5
2. Question
Who specifies the forces the steelwork connections need to be able to handle?
CorrectIncorrect -
Question 3 of 5
3. Question
How long has the steel construction sector been using steelwork design software?
CorrectIncorrect -
Question 4 of 5
4. Question
What type of software is used to process the bill of materials data from the model during the design phase?
CorrectIncorrect -
Question 5 of 5
5. Question
What is the benefit of applying coatings including intumescent paints offsite?
CorrectIncorrect